North O'Henry Boulevard Waterline

Upon selection as an On-Call Consultant to the City of Greensboro’s Water Resources Department, WSAA was contracted to complete a waterline in O’Henry Blvd. Although the missing segment is only 1000 feet long, the design is complicated by the presence of a fiber optic trunk line and the adjacent Highway 29 controlled access. WSAA was able to negotiate open cut of the roadway in order to avoid bore pits within the controlled access. WSAA is providing construction administration for the project.