Natural Science Center

WSAA provided civil engineering design for the three phase master plan associated with $20 million in bond funding. Construction documents, permitting, technical specifications, bidding assistance, value engineering and construction administration were provided for the demolition of the existing parking lot and Phase I SciQuarium addition with associated site infrastructure and Phase II parking lot, totaling 388 spaces. Assistance was provided at multiple stakeholder meetings.