Southwest Guilford Track Renovation

Guilford County Schools selected WSAA to design track and field renovations at four high schools. The existing track surface at Southwest High School was demolished and a new latex surface was installed. The event surfaces and landing pits were upgraded, including the addition of a second sand pit. The lane widths were increased to meet current track standards and a sidewalk adjacent to the track to provide access to the visitors side was installed.