Immaculate Heart of Mary School

WSAA provided civil engineering design of new K-8 academic building on an occupied campus including parking, utilities, athletic fields, plazas, stormwater pond and bioretention cells. WSAA previously designed the collocated church site which remained open during construction. The design included a wet detention pond sized and multiple bioretention cells along the perimeter of the parking lot, which also serve as the required landscaping.