GTCC Master Watershed Plan

In order to meet the watershed requirements of a growing campus, WSAA was engaged to create a master watershed plan for the Main Campus. WSAA analyzed existing conditions and plans for future built upon area and determined that the stormwater treatment needs for the campus can be met with the addition of a sandfilter and development of an impervious surface bank. The sand filter was designed to fit within an existing parking lot.