DCCC Entrance Improvements

The DCCC Entrance Improvements project consisted of the redesign of the existing entrance to the main campus. The new entrance was redesigned to align with a roundabout at the entrance driveway being constructed by NCDOT. The entrance was redesigned from the NCDOT roundabout into the site to include the redesign of two intersections to roundabouts and the reconfiguration of parking lots. Bidding services and construction administration were also provided.